3305 Main Street Ste 019 Vancouver, WA 98663

Liberty Reports 1.00.0050

What's New in Liberty Reports 1.00.0050

Revision Posted 1/17/2014

Three stock templates were fixed to handle database changes in v19.2 and a new template was added for each that works for earlier versions of Sage 100 Contractor.

  • Job Cost Forecast by Cost Code (pre v19)
  • Ledger Transactions (pre v19)
  • Work In Progress (pre v19)

Revision Posted 10/31/2013

The Sage 100 Contractor flavor received the following updates for v19.x compatibility.

  • Now accommodate database changes in Sage 100 Contractor v19.x. This version maintains backward compatibility with previous versions of Sage 100 Contractor.
  • Desktop reports updated for a smoother startup experience.
  • Two new reports added to maintain support for pre-v19 installations.

The following enhancements apply to all flavors of Liberty Reports:

  • New more powerful event raising architecture.
  • Added Before and After events to Save as Values.
  • Updated the digital certificate for the add-in.

Originally Posted 4/17/2013

This version contains the following enhancements:

  • The Prolog Manager and Sage 100 Contractor flavors of Liberty Reports now reflect user-customized field captions.
  • Any sorting that the user applies to the lists in the Manage Connections window is now remembered.
  • A user with a permanent Designer license is now able to use a Standard evaluation license.
  • All licenses are now included in the Environment report instead of just the ones that had been touched during the Excel session.
  • If the destination range of an LRDrillDown function contains multiple cells that consist of a single merged area, we now assign the new value just to the upper-left cell in the range.