This step of the wizard is displayed if the size of the Job Cost - Cost Code field is greater than the size of the Prolog Manager Budget Group field that it has been mapped to.
There is no action to take on this step except to be aware of the potential ramifications of using a Cost Code value in Job Cost that is longer than what can be supported within Prolog Manager.